300712SZSE

Progress Announcement on Guarantee Limit for Controlling Subsidiary

✨ AI Summary

Fujian Yongfu Electric Power Design Co., Ltd. has provided a guarantee of up to RMB 2 million for its controlling subsidiary, Sichuan Yuneng Water Conservancy and Electric Power Engineering Consulting Co., Ltd. This guarantee was approved by the board and shareholders in April and May 2025. The subsidiary has fully utilized this guarantee for financing needs with Chengdu Bank.

Summary generated by AI · Always verify with source document

Full Translation

AI Translation· azure_openai

Fujian Yongfu Electric Power Design Co., Ltd. (hereinafter referred to as "the Company" or "Yongfu Co.") and all members of the board guarantee that the information disclosed is true, accurate, and complete, without false records, misleading statements, or significant omissions.

Overview of External Guarantees

On April 25, 2025, the Company held the second meeting of the fourth board of directors and the second meeting of the fourth board of supervisors, where it reviewed and approved the proposal on the estimated external guarantee limit. The Company agreed to provide a guarantee for its controlling subsidiary, Sichuan Yuneng Water Conservancy and Electric Power Engineering Consulting Co., Ltd. (hereinafter referred to as "Sichuan Yuneng"), with a guarantee limit not exceeding RMB 10 million. The guarantee methods include but are not limited to joint liability guarantees, performance guarantees, mortgage guarantees, and pledge guarantees. This matter was approved by the Company's annual general meeting held on May 20, 2025. For specific details, please refer to the announcements disclosed by the Company on April 28, 2025, and May 20, 2025, on the Giant Tide Information Network (http://www.cninfo.com.cn).

Sign in to read the full translation

Free accounts get 10 full releases per month. Pro subscribers get unlimited access.